|
By 1980 Stoughton
had outgrown the original Stoughton location. Since suitable facilities could
not be found to accommodate the growth, a new 16,000 facility was found in
Hanover, Massachusetts.
1990 Andry and Dolores
Lagsdin appointed Eric Lagsdin to Vice President of Operations.
1994 Andry and Dolores
appointed Andris Lagsdin to the position of director of Sales and
Marketing.
In 2000, Stoughton
strengthened its management team with the addition of Peter Kehew. Peter brings
a strong finance and consulting background to help with the growth of the
company
2001 Stoughton
strengthened its manufacturing capability by adding 5,000 square feet of
space.
Stoughton currently is the
World Leader in the development and manufacturing of the benchmark, FlipPad
reversible stabilizer pad that is recognized symbol of the state of the art
design and craftsmanship.
2003 was a special year
for Stoughton. By working closely with Industry giants, dealerships and end
users, and over 3 years of research and development, Stoughton developed the
Worlds First Double Sided Rubber FlipPad and Double sided Street pad. The
world's first stabilizer pad with a reversible rubber. In the fall of 2004,
Stoughton will be manufacturing both patented designs to Industry Leaders.
2005 Stoughton has
begins working with local manufactures and design facilities to powder coat and
fabricate products using Stoughton's state of the art powder coat line and
fabricating capabilities. |